Inspections OK
92%
11 of 12 actions
Failures by type
sensor timeout1
Anomalies by severity
HIGH1
MEDIUM1
Success by config here
V1100% (6/6)
V283% (5/6)
Where it is
WP10 marked on the two-floor map
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Assets
Every action here references an asset registered at this waypoint.
Registered here (assets.csv)
- PUMP-205 Pump 05 MEDIUM
Inspected here (actions.csv)
- PUMP-205 Pump 05
Every action at WP10
12 actions across all missions, in kit time order
| Mission | Kit time | Asset | Inspection | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|
| M001 | 09-01 18:06 | PUMP-205 Pump 05 | visual | OK | 85 score | |
| M001 | 09-01 18:09 | PUMP-205 Pump 05 | acoustic | OK | 63.5 dB | |
| M003 | 09-02 10:08 | PUMP-205 Pump 05 | thermal | OK | none | |
| M003 | 09-02 10:14 | PUMP-205 Pump 05 | thermal | OK | 75.1 C | |
| M010 | 09-04 18:19 | PUMP-205 Pump 05 | visual | OK | 94 score | |
| M018 | 09-07 10:29 | PUMP-205 Pump 05 | navigation | OK | 88.7 pct | |
| M020 | 09-08 02:10 | PUMP-205 Pump 05 | thermal | OK | 72.5 C | |
| M020 | 09-08 02:20 | PUMP-205 Pump 05 | acoustic | OK | 64.8 dB | MEDIUM abnormal vibration |
| M021 | 09-08 10:11 | PUMP-205 Pump 05 | acoustic | OK | 69.4 dB | |
| M021 | 09-08 10:15 | PUMP-205 Pump 05 | thermal | OK | 64.7 C | |
| M024 | 09-09 10:05 | PUMP-205 Pump 05 | acoustic | sensor timeout | 79.6 dBquestionable | HIGH abnormal vibration |
| M027 | 09-10 10:20 | PUMP-205 Pump 05 | gauge reading | OK | none |