CRITICALnavigation obstructionElectrical Panel 12 · high criticality · Turbine Hall SouthM017 · 09-07 02:27
What Spot saw
Action
navigation
Result
Failed, communication loss
Reading
64.7 pct · questionable quality
Battery
22%
Sample image from NextEra's kit (synthetic), not this exact capture
Context
Asset criticality
high
Anomalies on this asset
5 in the kit
Anomalies at this location
6 in the kit
Location success rate
64% (14/22)
Why this needs you
Critical navigation obstruction on Electrical Panel 12, a high criticality asset. The inspection itself failed (communication loss), so the reading may not be trustworthy. Decide on a work order before the next round.
CRITICALabnormal temperatureHeat Exchanger 04 · medium criticality · Control Room CorridorHidden in COMPLETEDM020 · 09-08 02:08
What Spot saw
Action
thermal inspection
Result
OK
Reading
41.4 C · good quality
Battery
80%
Sample image from NextEra's kit (synthetic), not this exact capture
Context
Asset criticality
medium
Anomalies on this asset
4 in the kit
Anomalies at this location
3 in the kit
Location success rate
CRITICALsignal degradationElectrical Panel 03 · medium criticality · Pipe GalleryHidden in COMPLETEDM007 · 09-03 18:02
What Spot saw
Action
navigation
Result
Failed, localization failure
Reading
49.2 pct · questionable quality
Battery
74%
Sample image from NextEra's kit (synthetic), not this exact capture
Context
Asset criticality
medium
Anomalies on this asset
3 in the kit
Anomalies at this location
8 in the kit
Location success rate
CRITICALgauge out of rangeElectrical Panel 11 · medium criticality · Turbine Hall SouthHidden in COMPLETEDM006 · 09-03 10:31
What Spot saw
Action
gauge reading
Result
Failed, reading unreliable
Reading
111.6 psi · questionable quality
Battery
15%
Sample image from NextEra's kit (synthetic), not this exact capture
Critical abnormal temperature on Heat Exchanger 04, a medium criticality asset. Its mission still reported COMPLETED, so mission status will not show this. Decide on a work order before the next round.
Critical signal degradation on Electrical Panel 03, a medium criticality asset. Its mission still reported COMPLETED, so mission status will not show this. The inspection itself failed (localization failure), so the reading may not be trustworthy. Decide on a work order before the next round.
Critical gauge out of range on Electrical Panel 11, a medium criticality asset. Its mission still reported COMPLETED, so mission status will not show this. The inspection itself failed (reading unreliable), so the reading may not be trustworthy. Decide on a work order before the next round.
High abnormal vibration on Heat Exchanger 02, a critical criticality asset. Its mission still reported COMPLETED, so mission status will not show this. The inspection itself failed (reading unreliable), so the reading may not be trustworthy. Spot flagged it for operator review.
High gauge out of range on Heat Exchanger 17, a critical criticality asset. Its mission still reported COMPLETED, so mission status will not show this. The inspection itself failed (sensor timeout), so the reading may not be trustworthy. Spot flagged it for operator review.