What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 1 of 10 inspections failed (reading unreliable).
- 1 serious anomaly needs review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 10:02 | WP01 Main EntranceElectrical Panel 15 | navigationSample image![]() | OK | 94.2 pct | 89% | |
| 2 | 10:05 | WP12 Heat Exchanger AreaValve 07 | acousticSample image![]() | OK | 70.5 dB | 86% | |
| 3 | 10:07 | WP06 Compressor AreaHeat Exchanger 17 | gauge readingSample image![]() | OK | 111.7 psi | 83% | |
| 4 | 10:10 | WP07 Control Room CorridorElectrical Panel 11 | thermalSample image![]() | OK | 57.8 C | 80% | |
| 5 | 10:12 | WP02 Electrical RoomHeat Exchanger 02 | acousticSample image![]() | reading unreliable | 70.8 dBquestionable | HIGH abnormal vibration | 76% |
| 6 | 10:15 | WP13 Warehouse CorridorHeat Exchanger 19 | navigationSample image![]() | OK | none | MEDIUM signal degradation | 73% |
| 7 | 10:17 | WP11 Battery RoomHeat Exchanger 10 | visualSample image![]() | OK | none | 70% | |
| 8 | 10:20 | WP10 Valve StationPump 05 | gauge readingSample image![]() | OK | none | 67% | |
| 9 | 10:22 | WP13 Warehouse CorridorHeat Exchanger 19 | navigationSample image![]() | OK | 96.3 pct | 64% | |
| 10 | 10:25 | WP03 Cooling LoopHeat Exchanger 08 | gauge readingSample image![]() | OK | 125.5 psi | 61% |




