What happenedReported COMPLETED · actually Clean
- Every inspection succeeded and no serious anomalies were found.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 02:02 | WP08 Turbine Hall NorthElectrical Panel 12 | visualSample image![]() | OK | 98 score | MEDIUM visual defect | 79% |
| 2 | 02:04 | WP03 Cooling LoopHeat Exchanger 08 | gauge readingSample image![]() | OK | 101.4 psi | 76% | |
| 3 | 02:06 | WP13 Warehouse CorridorHeat Exchanger 16 | thermalSample image![]() | OK | 67.1 C | 73% | |
| 4 | 02:09 | WP07 Control Room CorridorValve 07 | visualSample image![]() | OK | 90 score | 70% | |
| 5 | 02:11 | WP14 Auxiliary Systems BayMotor 06 | acousticSample image![]() | OK | 68 dB | 67% | |
| 6 | 02:13 | WP13 Warehouse CorridorHeat Exchanger 19 | navigationSample image![]() | OK | 88.9 pct | 64% | |
| 7 | 02:16 | WP12 Heat Exchanger AreaValve 07 | gauge readingSample image![]() | OK | 93.5 psi | 61% | |
| 8 | 02:18 | WP09 Turbine Hall SouthElectrical Panel 11 | navigationSample image![]() | OK | 79 pct | 58% | |
| 9 | 02:20 | WP02 Electrical RoomElectrical Panel 15 | visualSample image![]() | OK | 95 score | 55% | |
| 10 | 02:23 | WP15 Inspection DockHeat Exchanger 10 | acousticSample image![]() | OK | 79.4 dB | 52% |





