What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 2 of 10 inspections failed (signal noise, sensor timeout).
- 1 serious anomaly needs review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 18:01 | WP05 Pipe GalleryHeat Exchanger 01 | navigationSample image![]() | OK | 90.3 pct | 91% | |
| 2 | 18:03 | WP12 Heat Exchanger AreaValve 07 | visualSample image![]() | OK | 77 score | 89% | |
| 3 | 18:05 | WP12 Heat Exchanger AreaElectrical Panel 18 | navigationSample image![]() | OK | 87 pct | 87% | |
| 4 | 18:07 | WP01 Main EntranceElectrical Panel 15 | navigationSample image![]() | OK | 94.4 pct | 85% | |
| 5 | 18:09 | WP09 Turbine Hall SouthElectrical Panel 12 | gauge readingSample image![]() | OK | 99 psi | 82% | |
| 6 | 18:10 | WP11 Battery RoomHeat Exchanger 10 | thermalSample image![]() | OK | 73.9 C | 80% | |
| 7 | 18:12 | WP11 Battery RoomHeat Exchanger 10 | acousticSample image![]() | signal noise | 64.7 dBquestionable | HIGH abnormal vibration | 78% |
| 8 | 18:14 | WP02 Electrical RoomElectrical Panel 12 | navigationSample image![]() | OK | 97.1 pct | LOW signal degradation | 76% |
| 9 | 18:16 | WP07 Control Room CorridorHeat Exchanger 08 | gauge readingSample image![]() | sensor timeout | 117.7 psiquestionable | LOW gauge out of range | 74% |
| 10 | 18:18 | WP08 Turbine Hall NorthHeat Exchanger 01 | visualSample image![]() | OK | 96 score | 72% |





