What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 3 of 10 inspections failed (localization failure, sensor timeout, signal noise).
- 1 serious anomaly needs review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 10:03 | WP05 Pipe GalleryElectrical Panel 03 | navigationSample image![]() | localization failure | 59.5 pctquestionable | LOW signal degradation | 72% |
| 2 | 10:06 | WP11 Battery RoomHeat Exchanger 10 | visualSample image![]() | OK | 92 score | MEDIUM visual defect | 67% |
| 3 | 10:10 | WP05 Pipe GalleryHeat Exchanger 02 | visualSample image![]() | OK | 86 score | 62% | |
| 4 | 10:13 | WP08 Turbine Hall NorthPressure Gauge 09 | visualSample image![]() | OK | 80 score | 57% | |
| 5 | 10:17 | WP03 Cooling LoopHeat Exchanger 08 | acousticSample image![]() | OK | 82.4 dB | 52% | |
| 6 | 10:20 | WP04 Pump BayCompressor 14 | acousticSample image![]() | sensor timeout | 59.8 dBquestionable | LOW abnormal vibration | 47% |
| 7 | 10:23 | WP07 Control Room CorridorHeat Exchanger 13 | acousticSample image![]() | signal noise | none | HIGH abnormal vibration | 42% |
| 8 | 10:27 | WP03 Cooling LoopHeat Exchanger 08 | visualSample image![]() | OK | none | 37% | |
| 9 | 10:30 | WP13 Warehouse CorridorHeat Exchanger 16 | thermalSample image![]() | OK | 39.8 C | 32% | |
| 10 | 10:34 | WP08 Turbine Hall NorthElectrical Panel 03 | visualSample image![]() | OK | 99 score | 27% |