What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 2 of 10 inspections failed (localization failure, sensor timeout).
- 1 serious anomaly needs review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 18:02 | WP05 Pipe GalleryElectrical Panel 03 | navigationSample image![]() | localization failure | 49.2 pctquestionable | CRITICAL signal degradation | 74% |
| 2 | 18:05 | WP05 Pipe GalleryHeat Exchanger 02 | visualSample image![]() | OK | 71 score | 68% | |
| 3 | 18:08 | WP06 Compressor AreaHeat Exchanger 17 | navigationSample image![]() | OK | 97.3 pct | 63% | |
| 4 | 18:10 | WP07 Control Room CorridorElectrical Panel 11 | visualSample image![]() | OK | 85 score | 57% | |
| 5 | 18:13 | WP14 Auxiliary Systems BayPump 20 | navigationSample image![]() | OK | 91.7 pct | 52% | |
| 6 | 18:16 | WP07 Control Room CorridorHeat Exchanger 19 | thermalSample image![]() | OK | none | 47% | |
| 7 | 18:18 | WP11 Battery RoomHeat Exchanger 10 | thermalSample image![]() | OK | 65.6 C | 41% | |
| 8 | 18:21 | WP06 Compressor AreaHeat Exchanger 17 | navigationSample image![]() | OK | 79.1 pct | 36% | |
| 9 | 18:24 | WP09 Turbine Hall SouthElectrical Panel 12 | visualSample image![]() | OK | 83 score | 30% | |
| 10 | 18:27 | WP05 Pipe GalleryElectrical Panel 03 | acousticSample image![]() | sensor timeout | 70.5 dBquestionable | LOW abnormal vibration | 25% |



