What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 2 of 10 inspections failed (communication loss, sensor timeout).
- 1 serious anomaly needs review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 18:03 | WP05 Pipe GalleryHeat Exchanger 04 | navigationSample image![]() | communication loss | 66.2 pctquestionable | LOW navigation obstruction | 76% |
| 2 | 18:06 | WP11 Battery RoomHeat Exchanger 10 | visualSample image![]() | OK | 90 score | 70% | |
| 3 | 18:09 | WP07 Control Room CorridorHeat Exchanger 13 | thermalSample image![]() | OK | 70.6 C | 65% | |
| 4 | 18:12 | WP13 Warehouse CorridorHeat Exchanger 13 | visualSample image![]() | OK | 78 score | 59% | |
| 5 | 18:15 | WP11 Battery RoomHeat Exchanger 10 | navigationSample image![]() | OK | 89.2 pct | 54% | |
| 6 | 18:18 | WP01 Main EntranceElectrical Panel 15 | thermalSample image![]() | OK | 74.9 C | 49% | |
| 7 | 18:21 | WP06 Compressor AreaHeat Exchanger 17 | navigationSample image![]() | OK | none | HIGH localization issue | 43% |
| 8 | 18:24 | WP09 Turbine Hall SouthElectrical Panel 11 | gauge readingSample image![]() | sensor timeout | 68.6 psiquestionable | MEDIUM gauge out of range | 38% |
| 9 | 18:27 | WP06 Compressor AreaHeat Exchanger 17 | visualSample image![]() | OK | 77 score | 32% | |
| 10 | 18:30 | WP08 Turbine Hall NorthHeat Exchanger 02 | navigationSample image![]() | OK | 88.4 pct | 27% |