What happenedReported COMPLETED · actually Degraded
- Reported COMPLETED, but 1 of 10 inspections failed (reading unreliable).
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 02:03 | WP05 Pipe GalleryHeat Exchanger 02 | navigationSample image![]() | OK | none | 74% | |
| 2 | 02:06 | WP14 Auxiliary Systems BayMotor 06 | visualSample image![]() | OK | 73 score | 69% | |
| 3 | 02:09 | WP06 Compressor AreaHeat Exchanger 17 | acousticSample image![]() | OK | 85 dB | 64% | |
| 4 | 02:12 | WP01 Main EntranceElectrical Panel 15 | navigationSample image![]() | OK | none | 59% | |
| 5 | 02:15 | WP13 Warehouse CorridorHeat Exchanger 19 | visualSample image![]() | OK | 86 score | 54% | |
| 6 | 02:18 | WP09 Turbine Hall SouthElectrical Panel 11 | acousticSample image![]() | reading unreliable | 66.6 dBquestionable | MEDIUM abnormal vibration | 48% |
| 7 | 02:21 | WP03 Cooling LoopHeat Exchanger 08 | gauge readingSample image![]() | OK | 122.2 psi | 43% | |
| 8 | 02:24 | WP03 Cooling LoopHeat Exchanger 08 | gauge readingSample image![]() | OK | 104.7 psi | 38% | |
| 9 | 02:27 | WP11 Battery RoomHeat Exchanger 10 | acousticSample image![]() | OK | 71.7 dB | 33% | |
| 10 | 02:31 | WP05 Pipe GalleryElectrical Panel 03 | visualSample image![]() | OK | 82 score | 28% |



